Skip to content
Shipboard Operations

How do I prepare for a Port State Control inspection?

Prepare for Port State Control by keeping certificates and records current, safety equipment working, defects reported and the crew ready to run drills.

Updated 2026-11-09

Answer

You prepare for a Port State Control inspection by keeping the ship up to the standard of the conventions every day, and by having the evidence ready: valid certificates, records that match the equipment, working safety gear and a crew who know their duties. Port State Control officers check foreign ships against SOLAS, MARPOL, STCW, the Load Lines Convention, the Maritime Labour Convention and the other conventions in force in their country.

In detail

How often you are boarded depends on the regional regime. In the Paris MOU, which covers European and North Atlantic waters, and the Tokyo MOU in the Asia-Pacific, each ship has a risk profile. It is built from the ship's type and age, the performance of its flag, class society and managing company, and its own record of deficiencies and detentions over the previous 36 months. Under the Paris MOU, a high-risk ship is due for inspection every 5 to 6 months, a standard-risk ship every 10 to 12 months and a low-risk ship every 24 to 36 months. The US Coast Guard uses its own targeting system.

An inspection usually starts with the certificates, the documents and a walk round for a general impression. If the inspector finds clear grounds to believe the ship or crew do not meet the standards, a more detailed inspection follows. A ship with deficiencies that make it unsafe to sail or a threat to the environment is detained until they are put right, or until the inspector agrees conditions for it to sail to a repair yard.

Keep these ready in one place:

  • the statutory certificates, including the safety certificates, load line, IOPP, IAPP, sewage and ballast water management certificates
  • the ISM Document of Compliance and Safety Management Certificate, the ISSC, and the Maritime Labour Certificate with its declaration
  • the minimum safe manning document, crew certificates of competency, endorsements and medical certificates
  • hours of rest records and seafarer employment agreements
  • the Oil Record Book, Garbage Record Book and other record books, with entries that match tank soundings and logbooks

Inspectors often ask for a demonstration. They may call a fire or abandon ship drill, ask for a lifeboat to be lowered, or ask for the emergency generator, emergency fire pump or emergency steering to be started. They may ask an engineer to show the oily water separator and its 15 ppm alarm working. Crew members should be able to do their muster duties and explain them in the ship's working language.

Before arrival, walk the ship as an inspector would. Fire safety, life-saving appliances and safety management failures are regular entries in the Paris MOU's lists of detainable deficiencies. Check that:

  • fire doors close and latch, fire dampers operate and detection systems test correctly
  • lifeboats, davits, release gear, liferafts and hydrostatic release units are in good order and in date
  • charts and publications are corrected, or the ECDIS is updated
  • escape routes are clear and emergency lighting works
  • the engine room has no oil in the bilges or leaking pipework

Report any known defect to the company, and to the flag state and class where needed, and record it with a repair plan. An inspector still decides whether the ship is safe to sail. A defect that has been reported and planned for is evidence the safety management system is working, which a defect found first by the inspector cannot give. On the day, have an officer accompany the inspector, produce documents promptly and answer questions honestly.

Related Terms

Continue Reading

More Questions in Shipboard Operations

What should be checked during engine-room watchkeeping rounds?

An engine-room round compares readings, sounds and smells with normal values for the current load, logs real figures and spots trends before alarms do.

What is a toolbox talk and when is it done?

A toolbox talk is a short safety briefing at the job site before work starts, held before higher-risk work and repeated whenever the job or conditions change.

What must be checked before enclosed space entry?

The core precautions before entering an enclosed space — atmosphere testing, permit, ventilation, standby and communications — because these spaces still kill seafarers.

What are the key steps in a safe bunkering operation?

Safe bunkering means an agreed plan and checklist, deck prepared against spills, close watch at topping off, a MARPOL sample and checked delivery figures.