What are the four stages of passage planning (appraisal, planning, execution, monitoring)?

Passage planning has four stages: appraisal, planning, execution and monitoring. The plan covers the voyage from berth to berth, pilotage waters included.

Updated 2026-11-09

Short answer

The four stages of passage planning are appraisal, planning, execution and monitoring. SOLAS regulation V/34 requires a voyage plan before every voyage, and IMO resolution A.893(21), the Guidelines for Voyage Planning, sets out the four stages. The plan runs from berth to berth, including the pilotage waters at each end.

In detail

Appraisal is gathering the information and working out the risks. The navigating officer, usually the second officer, collects the charts and publications for the route: sailing directions, lists of lights, tide tables and tidal stream atlases, routeing guides, notices to mariners and navigational warnings. They look at expected weather and seasonal hazards, traffic separation schemes, ship reporting systems, pilotage requirements and any port or environmental restrictions. They set these against the ship itself: its draught, air draught, squat, manoeuvring characteristics and the under keel clearance the company requires. The result is a clear picture of where the route is tight and why.

Planning is laying down the route. Today that is usually done in ECDIS, with paper charts on ships that still use them. The plan shows courses and distances, no-go areas, the safety contour, wheel-over points, parallel index lines, positions to report or change speed, abort points and contingency anchorages. It sets the margins to keep from dangers and the methods and frequency of position fixing for each leg. ECDIS route checking should be run against the plan to flag any leg that crosses the safety contour or a hazard. Under most company procedures the master approves the plan before the ship sails.

Execution is carrying the plan out. It means confirming the estimated times of arrival, timing passages through shallow or tidal areas to the right state of tide, and adjusting speed to meet the pilot. The bridge team is briefed so everyone knows the plan. When a pilot boards, the master and pilot exchange information about the passage, the ship and the conditions, and the pilot's advice is checked against the ship's own plan.

Monitoring runs all through the passage. The officer of the watch checks the ship's position against the planned track at the intervals the plan sets, cross-checking GNSS with radar ranges and bearings, parallel indexing and visual bearings, so that a single faulty sensor cannot lead the ship off track unnoticed. Set and drift, changes in the weather, traffic and equipment faults all show up here first.

If the weather, a port instruction or a defect changes the voyage, the plan is revised, approved again by the master, and the bridge team briefed on the change before it takes effect.

Related Terms

Continue Reading

More Questions in Shipboard Operations

What should be checked during engine-room watchkeeping rounds?

An engine-room round compares readings, sounds and smells with normal values for the current load, logs real figures and spots trends before alarms do.

What is a toolbox talk and when is it done?

A toolbox talk is a short safety briefing at the job site before work starts, held before higher-risk work and repeated whenever the job or conditions change.

What must be checked before enclosed space entry?

The core precautions before entering an enclosed space — atmosphere testing, permit, ventilation, standby and communications — because these spaces still kill seafarers.

What are the key steps in a safe bunkering operation?

Safe bunkering means an agreed plan and checklist, deck prepared against spills, close watch at topping off, a MARPOL sample and checked delivery figures.