What is a permit to work (PTW) system on ships?

A permit to work is a signed authorisation for a hazardous job, such as hot work or enclosed space entry, issued only after hazards are checked and controlled.

Updated 2026-11-09

Answer

A permit to work (PTW) system is the shipboard procedure for authorising hazardous or non-routine jobs in writing. Before work starts, a responsible officer confirms that the hazards have been assessed, the precautions are in place, and the people doing the job understand them. The permit records the job, the place, the precautions and the period for which it is valid.

In detail

Permits are normally required for:

  • entry into enclosed spaces such as cargo and ballast tanks, cofferdams, void spaces, chain lockers and duct keels
  • hot work outside the engine room workshop, such as welding, burning and grinding
  • work on electrical equipment that needs isolation, and any work on high-voltage systems
  • working aloft or over the side
  • opening pressurised systems, or working on machinery that could start or move, such as the main engine, steering gear or cranes

Each company sets its own list in its safety management system, and some add jobs such as diving operations or disabling fire detection.

The permit links several controls. A job-specific risk assessment comes first. The equipment is then isolated, locked and tagged, and proved dead or depressurised. For enclosed space entry the space is ventilated and its atmosphere tested for oxygen, flammable gas and any toxic gas the cargo or the space could produce, an attendant is posted at the entrance, and a rescue plan is agreed. For hot work, combustible material is removed, the area and the spaces around it are checked for gas, and a fire watch with an extinguisher stays during the job and for a period afterwards. The officer signing the permit checks these things at the work site.

Permits are usually issued by the chief officer or chief engineer for their own departments, and on many ships the master countersigns the riskiest ones, such as enclosed space entry and hot work outside the workshop. The bridge or engine control room is told when the work starts. A permit is valid only for the conditions written on it and normally for a limited time, often one shift or one working day. If the job changes, the gas readings change, an alarm sounds or the people doing the work change, work stops and the permit is reviewed or a new one issued.

When the job is finished, the person in charge confirms that people and tools are out and the area is safe. Only then are isolations removed and systems restored, and the permit is signed off and filed.

The ISM Code requires companies to have procedures for key shipboard operations, and the PTW system is how most companies meet that for hazardous work. Enclosed space procedures normally follow the IMO Revised Recommendations for Entering Enclosed Spaces aboard Ships, resolution MSC.581(110), and SOLAS requires enclosed space entry and rescue drills at least every two months. Accident investigations into enclosed space deaths and hot work fires have often found jobs that started without a permit, or with a permit signed without anyone checking the space.

Related Terms

Continue Reading

More Questions in Shipboard Operations

What should be checked during engine-room watchkeeping rounds?

An engine-room round compares readings, sounds and smells with normal values for the current load, logs real figures and spots trends before alarms do.

What is a toolbox talk and when is it done?

A toolbox talk is a short safety briefing at the job site before work starts, held before higher-risk work and repeated whenever the job or conditions change.

What must be checked before enclosed space entry?

The core precautions before entering an enclosed space — atmosphere testing, permit, ventilation, standby and communications — because these spaces still kill seafarers.

What are the key steps in a safe bunkering operation?

Safe bunkering means an agreed plan and checklist, deck prepared against spills, close watch at topping off, a MARPOL sample and checked delivery figures.