What is Alternative Marine Power (AMP) or Cold Ironing?
Alternative Marine Power (AMP) is a pollution control measure that helps reduce air pollution generated by diesel generators by using shore power as an alternative energy source.

What is Alternative Marine Power (AMP) or Cold Ironing?
Alternative Marine Power (AMP) is a way of cutting the air pollution a ship's diesel generators produce in port by supplying her with electricity from shore instead.
While the ship is alongside, shore power lets her shut down her generators and avoid running a diesel engine she does not need. That cuts the ship's emissions in port sharply. The same practice is also called shore power, onshore power supply (OPS) or cold ironing.
Alternative Marine Power
The basic idea is simple.
While a ship is loading or discharging at the berth, she takes her electricity from shore. A cable runs from a connection point on the quay to the ship's switchboard. The name cold ironing goes back to coal-fired steamships: when a ship tied up and let her boiler fires go out, her iron engines went cold.
Running on shore power reduces exhaust emissions and noise in the port and saves the diesel the generators would otherwise burn. Alternative Marine Power (AMP) supplies everything the ship needs at the berth: lighting, refrigeration and reefer containers, air conditioning, cargo equipment and the rest of the hotel load. The electricity can come from dedicated generators ashore or from the local grid.
Shore supplies to ships are delivered at one of a few standard voltages:
- 11,000 V AC (alternating current)
- 6,600 V AC
- 660/690 V AC
- 440 V AC
Large ships such as container ships and cruise ships usually take high-voltage supplies at 6.6 kV or 11 kV, because the current at 440 V would need too many heavy cables.
Some ports and governments now require shore power. California led the way. Under the state's at-berth regulation, container ships, reefer ships and cruise ships calling at the Port of Los Angeles and other California ports must shut down their auxiliary engines and plug in to shore power, or use an approved emissions control system, and the rule has been extended to other ship types. Shutting down the generators cuts both noise and air pollution at the berth.
In the European Union, FuelEU Maritime requires container ships and passenger ships to use shore power at major EU ports from 2030.
An AMP system on board is made up of several key components: the cable reel (cable drum), the drum control centre and pendant control, the AMP junction box, the 6.6 kV shore connection panel, a transformer, the main switchboard and the AMP control panel.
Each is described below.
Cable Drum
The cable drum is a powered reel on board that holds the cable connecting the ship to the shore supply while she is alongside. The cable carries both power and, on many systems, fibre-optic communication lines.
Once the cable is connected, the drum is switched to automatic and keeps the cable at a set tension, paying out or reeling in as the ship rises and falls with the tide and cargo work or moves with the wind. The drum is earthed to the ship's hull with an earthing bolt.
Drum Control Center and Pendant Control Cable
The drum control centre is a weatherproof (IP-rated) enclosure holding the switchgear that runs the drum motor. The operator uses a pendant control with four functions, and indicator lights on the door show the drum's status.
AMP Junction Box
The AMP junction box connects the fixed cable from the drum to the ship's cabling. Ships often have a connection point on each side, port and starboard, so they can plug in whichever side is alongside. The fixed connection inside normally stays made up except during maintenance.
6600V Grounding Box
This panel receives the incoming high-voltage shore supply. It contains a vacuum circuit breaker (VCB), a high-voltage earthing switch (ES) and a high-voltage protection relay. The earthing switch makes the incoming cable safe before anyone handles it.
Converter
On a ship with a low-voltage switchboard, a transformer steps the shore supply down from high voltage to the ship's working voltage before it reaches the main switchboard (MSB).
Main Switchboard
The AMP section of the main switchboard (MSB) can synchronise the ship's generators with the shore supply automatically or manually, so the load can be transferred without a blackout.
AMP Control Panel
This panel controls the AMP system and shows its status.
Fiber Optic Communications
Many AMP systems use fibre-optic links between ship and shore to carry the safety and control signals, such as the emergency stop circuit. Clean connectors are essential, because dirt in a fibre-optic connection can break the link and trip the system.
Even tiny dust particles cause trouble. A human hair is typically 50 to 75 microns thick, while the light-carrying core of a single-mode fibre is only about 9 microns across, so a speck of dust too small to see can block a large part of it. Dust in the air settles on connectors, and salt, oil and moisture also have to be cleaned off the connector faces.
AMP Junction Boxes
Cable Reel Overview
Cables: The cables carry power and fibre-optic communications. They are built for reeling, so they are flexible and have high tensile strength, with sheaths that stand up to the marine environment.
Reels: The reel stores the cable. Its inner diameter must respect the cable's minimum bend radius and give the right relationship between motor torque and cable tension. Its outer diameter must be big enough to hold the full length of cable.
Guide: The guide gives the cable a smooth, low-friction path between the drum and the ship's side. It is made of a series of rollers set on a radius larger than the cable's minimum bend radius.
Slip ring assembly: This passes power and data between the rotating reel and the fixed cabling on the ship.
Hydraulic Transmission: The drive is a reduction gearbox with an oil-immersed, torque-limiting clutch. Torque is transmitted by shearing oil between rotating discs, and adjusting the pressure on the discs sets the torque, and so the cable tension, over a wide range.
Shore power has spread quickly. Navies have long plugged their ships in alongside, and commercial use has grown fast over the last two decades as ports and governments have pushed to cut emissions in port cities. It is likely to become more common still as new rules take effect.
Ship-to-Shore Transfer Procedure
Load can be transferred from ship to shore automatically or manually.
In automatic transfer, the system synchronises the supplies and shifts the load itself. In manual transfer, the engineer synchronises and transfers the load by hand. Either way, the changeover is usually made with a single generator running, and the load is brought down as low as possible first so the switch happens at minimum load.
How is a cold ironing circuit connected?
Ampere Connection Procedure
First, reduce the electrical load as far as possible, run a single generator and check the switchboard voltage is about 440 V. Connect the pendant control to the drum. The drum is then ready, and the operating light on the drum control centre comes on.
Press the hoist button to lift the cable plug out of its stowage. When it reaches the upper limit, the drum stops automatically.
Lead the cable through the cable guide and prepare to lower it. Pay the cable out, checking there are no obstructions, twists or kinks, until it reaches the shore staff on the quay.
The shore staff pull the cable to the shore connection box while it is still slack, remove the protective cap and plug it into the shore outlet. The plugs must be matched by their colour coding and fully seated.
Once the cable is connected, switch the drum selector to automatic. The drum will now take up any slack caused by the ship's movement and the wind.
Check with the shore staff whether the fibre-optic link is being used. If it is, set the fibre-optic switch to the master position. If not, keep in touch by VHF or telephone.
Test the emergency stop on the AMP control panel. The pilot light should go out to show the emergency stop has worked.
Test the emergency stop on the cable drum control panel the same way. The light should go out to confirm it has worked. Then reset from the panel.
When all the tests are complete, prepare to close the vacuum circuit breaker (VCB). Confirm with the shore staff that the VCB can be closed, and then close it.
With the VCB closed, the ship can be synchronised. First check that the incoming shore power parameters (voltage, frequency and phase sequence) are correct and within limits. For automatic synchronisation, press the "SYNC" button on the AMP control panel and the system will match the shore supply to the ship's generator. For manual synchronisation, use the synchroscope or the three-lamp method.
Once shore power and the generator are synchronised and in parallel, unload the generator so the shore supply takes the whole load. When the generator is unloaded, open its breaker. The ship is now running on shore power.
Ports charge for shore electricity by the kilowatt-hour, so keep the load as low as is practical while on shore power to avoid a large bill.
AMP Disconnection Procedure
Disconnection is the connection procedure in reverse. These are the steps for transferring load from shore power back to the ship's generators:
Start a diesel generator and synchronise it with the shore supply, automatically or manually. Once the generator has taken the load, open the AMP vacuum circuit breaker (VCB) to take shore power off the board. Do not open the AMP VCB until the shore staff have agreed.
With the AMP VCB open, the ship is running on her own generator and the cable can be disconnected.
Switch the drum selector to manual and press the "Down" button to give the cable some slack.
The shore staff unplug the cable and refit the protective cover.
Press the "Up" button to reel the cable in. Do not let the plug and its cover drag along the quay; guide it by hand to reduce wear.
Keep pressing "Up" until the plug reaches its upper limit. With a second person helping, use the "Down" button to guide the plug into its stowage. Then shut down the drum control centre.
Cold ironing has clear benefits, but it also has drawbacks:
Cost. A large ship uses a lot of power in port, and shore electricity can cost more than running the ship's own generators, depending on local electricity prices and taxes.
Every port that offers shore power has to invest heavily in grid connections, substations and berth equipment, and often in frequency converters, because many ships run at 60 Hz while much of the world's grid supplies 50 Hz.
Many existing ships are not fitted for shore power, and retrofitting them with the necessary equipment also takes significant investment.
The emissions savings only apply while the ship is alongside. At sea she still runs her engines and puts exhaust gases into the atmosphere.
Recommended Reading

How do ships generate power in sea?
Ships at sea generate their own electrical power: the source is a set of AC generators turned by the ship's engines, feeding a main switchboard that usually runs at 440 volts.

How Does A Cruise Ship Get Its Power?
Cruising has soared in popularity, captivating travelers with promises of luxury, adventure, and relaxation.

Athens Navy Power and Maritime History
As the beacon of democracy and cultural enlightenment in antiquity, Athens used exceptional maritime power that moulded the course of history.
